champagne-light-neutral-european-oak-hardwood-flooring_entry-and-stairs-tall-1.jpg

INSTALL

This is the page description.

—  phase 3  —

Its in the Details

Installation

Now that the material is chosen, the details are in place, the floor is prepared to standard, We install. After the completion of the project we then do a thorough walk through with our client to make sure every detail discussed has been implemented. The job site is cleaned, our client is satisfied and can now enjoy the final product.

Hours
Mon–Fri  9-5
Sat  9–2
Sun  Closed